Saturday, December 18, 2010

Software development process

A software development process, also known as a software development lifecycle, is a structure imposed on the development of a software product. Similar terms include software life cycle and software process. There are several models for such processes, each describing approaches to a variety of tasks or activities that take place during the process. Some people consider a lifecycle model a more general term and a software development process a more specific term. For example, there are many specific software development processes that 'fit' the spiral lifecycle model.

Overview

The large and growing body of software development organizations implement process methodologies. Many of them are in the defense industry, which in the U.S. requires a rating based on 'process models' to obtain contracts.

The international standard for describing the method of selecting, implementing and monitoring the life cycle for software is ISO 12207.

A decades-long goal has been to find repeatable, predictable processes that improve productivity and quality. Some try to systematize or formalize the seemingly unruly task of writing software. Others apply project management techniques to writing software. Without project management, software projects can easily be delivered late or over budget. With large numbers of software projects not meeting their expectations in terms of functionality, cost, or delivery schedule, effective project management appears to be lacking.

Organizations may create a Software Engineering Process Group (SEPG), which is the focal point for process improvement. Composed of line practitioners who have varied skills, the group is at the center of the collaborative effort of everyone in the organization who is involved with software engineering process improvement.

Software development activities

The activities of the software development process represented in the waterfall model. There are several other models to represent this process.

Planning

The important task in creating a software product is extracting the requirements or requirements analysis. Customers typically have an abstract idea of what they want as an end result, but not what software should do. Incomplete, ambiguous, or even contradictory requirements are recognized by skilled and experienced software engineers at this point. Frequently demonstrating live code may help reduce the risk that the requirements are incorrect.

Once the general requirements are gathered from the client, an analysis of the scope of the development should be determined and clearly stated. This is often called a scope document.

Certain functionality may be out of scope of the project as a function of cost or as a result of unclear requirements at the start of development. If the development is done externally, this document can be considered a legal document so that if there are ever disputes, any ambiguity of what was promised to the client can be clarified.

Implementation, testing and documenting

Implementation is the part of the process where software engineers actually program the code for the project.

Software testing is an integral and important part of the software development process. This part of the process ensures that defects are recognized as early as possible.

Documenting the internal design of software for the purpose of future maintenance and enhancement is done throughout development. This may also include the writing of an API, be it external or internal. It is very important to document everything in the project.

Deployment and maintenance

Deployment starts after the code is appropriately tested, is approved for release and sold or otherwise distributed into a production environment.

Software Training and Support is important and a lot of developers fail to realize that. It would not matter how much time and planning a development team puts into creating software if nobody in an organization ends up using it. People are often resistant to change and avoid venturing into an unfamiliar area, so as a part of the deployment phase, it is very important to have training classes for new clients of your software.

Maintaining and enhancing software to cope with newly discovered problems or new requirements can take far more time than the initial development of the software. It may be necessary to add code that does not fit the original design to correct an unforeseen problem or it may be that a customer is requesting more functionality and code can be added to accommodate their requests. If the labor cost of the maintenance phase exceeds 25% of the prior-phases' labor cost, then it is likely that the overall quality of at least one prior phase is poor.In that case, management should consider the option of rebuilding the system (or portions) before maintenance cost is out of control.

Bug Tracking System tools are often deployed at this stage of the process to allow development teams to interface with customer/field teams testing the software to identify any real or perceived issues. These software tools, both open source and commercially licensed, provide a customizable process to acquire, review, acknowledge, and respond to reported issues. (software maintenance).

Software Development Models

Several models exist to streamline the development process. Each one has its pros and cons, and it's up to the development team to adopt the most appropriate one for the project. Sometimes a combination of the models may be more suitable.

Waterfall Model

The waterfall model shows a process, where developers are to follow these phases in order:

  1. Requirements specification (Requirements analysis)
  2. Software Design
  3. Integration
  4. Testing (or Validation)
  5. Deployment (or Installation)
  6. Maintenance

In a strict Waterfall model, after each phase is finished, it proceeds to the next one. Reviews may occur before moving to the next phase which allows for the possibility of changes (which may involve a formal change control process). Reviews may also be employed to ensure that the phase is indeed complete; the phase completion criteria are often referred to as a "gate" that the project must pass through to move to the next phase. Waterfall discourages revisiting and revising any prior phase once it's complete. This "inflexibility" in a pure Waterfall model has been a source of criticism by supporters of other more "flexible" models.

Spiral Model

The key characteristic of a Spiral model is risk management at regular stages in the development cycle. In 1988, Barry Boehm published a formal software system development "spiral model", which combines some key aspect of the waterfall model and rapid prototyping methodologies, but provided emphasis in a key area many felt had been neglected by other methodologies: deliberate iterative risk analysis, particularly suited to large-scale complex systems.

The Spiral is visualized as a process passing through some number of iterations, with the four quadrant diagram representative of the following activities:

  1. formulate plans to: identify software targets, selected to implement the program, clarify the project development restrictions;
  2. Risk analysis: an analytical assessment of selected programs, to consider how to identify and eliminate risk;
  3. the implementation of the project: the implementation of software development and verification;

Risk-driven spiral model, emphasizing the conditions of options and constraints in order to support software reuse, software quality can help as a special goal of integration into the product development. However, the spiral model has some restrictive conditions, as follows:

  1. spiral model emphasize risk analysis, but require customers to accept and believe that much of this analysis, and make the relevant response is not easy, therefore, this model is often adapted to large-scale internal software development.
  2. If the implementation of risk analysis will greatly affect the profits of the project, then risk analysis is meaningless, therefore, spiral model is only suitable for large-scale software projects.
  3. Good software developers should look for possible risks, an accurate analysis of risk, otherwise it will lead to greater risk.

First stage is to determine the stage of the goal of accomplishing these objectives, options and constraints, and then from the perspective of risk analysis program, development strategy, and strive to remove all potential risks, and sometimes necessary to achieve through the construction of the prototype. If some risk can not be ruled out, the program to end immediately, or else start the development of the next steps. Finally, evaluation results of the stage, and the design of the next phase.

Iterative and Incremental development

Iterative development[1] prescribes the construction of initially small but ever larger portions of a software project to help all those involved to uncover important issues early before problems or faulty assumptions can lead to disaster. Iterative processes are preferred[citation needed] by commercial developers because it allows a potential of reaching the design goals of a customer who does not know how to define what they want.

Agile development

Agile software development uses iterative development as a basis but advocates a lighter and more people-centric viewpoint than traditional approaches. Agile processes use feedback, rather than planning, as their primary control mechanism. The feedback is driven by regular tests and releases of the evolving software.

There are many variations of agile processes:

  • In Extreme Programming (XP), the phases are carried out in extremely small (or "continuous") steps compared to the older, "batch" processes. The (intentionally incomplete) first pass through the steps might take a day or a week, rather than the months or years of each complete step in the Waterfall model. First, one writes automated tests, to provide concrete goals for development. Next is coding (by a pair of programmers), which is complete when all the tests pass, and the programmers can't think of any more tests that are needed. Design and architecture emerge out of refactoring, and come after coding. Design is done by the same people who do the coding. (Only the last feature — merging design and code — is common to all the other agile processes.) The incomplete but functional system is deployed or demonstrated for (some subset of) the users (at least one of which is on the development team). At this point, the practitioners start again on writing tests for the next most important part of the system.
  • Scrum

Process Improvement Models

Capability Maturity Model Integration
The Capability Maturity Model Integration (CMMI) is one of the leading models and based on best practice. Independent assessments grade organizations on how well they follow their defined processes, not on the quality of those processes or the software produced. CMMI has replaced CMM.
ISO 9000
ISO 9000 describes standards for a formally organized process to manufacture a product and the methods of managing and monitoring progress. Although the standard was originally created for the manufacturing sector, ISO 9000 standards have been applied to software development as well. Like CMMI, certification with ISO 9000 does not guarantee the quality of the end result, only that formalized business processes have been followed.
ISO 15504
ISO 15504, also known as Software Process Improvement Capability Determination (SPICE), is a "framework for the assessment of software processes". This standard is aimed at setting out a clear model for process comparison. SPICE is used much like CMMI. It models processes to manage, control, guide and monitor software development. This model is then used to measure what a development organization or project team actually does during software development. This information is analyzed to identify weaknesses and drive improvement. It also identifies strengths that can be continued or integrated into common practice for that organization or team.

Formal methods

Formal methods are mathematical approaches to solving software (and hardware) problems at the requirements, specification and design levels. Examples of formal methods include the B-Method, Petri nets, Automated theorem proving, RAISE and VDM. Various formal specification notations are available, such as the Z notation. More generally, automata theory can be used to build up and validate application behavior by designing a system of finite state machines.

Finite state machine (FSM) based methodologies allow executable software specification and by-passing of conventional coding (see virtual finite state machine or event driven finite state machine).

Formal methods are most likely to be applied in avionics software, particularly where the software is safety critical. Software safety assurance standards, such as DO178B demand formal methods at the highest level of categorization (Level A).

Formalization of software development is creeping in, in other places, with the application of Object Constraint Language (and specializations such as Java Modeling Language) and especially with Model-driven architecture allowing execution of designs, if not specifications.

Another emerging trend in software development is to write a specification in some form of logic (usually a variation of FOL), and then to directly execute the logic as though it were a program. The OWL language, based on Description Logic, is an example. There is also work on mapping some version of English (or another natural language) automatically to and from logic, and executing the logic directly. Examples are Attempto Controlled English, and Internet Business Logic, which does not seek to control the vocabulary or syntax. A feature of systems that support bidirectional English-logic mapping and direct execution of the logic is that they can be made to explain their results, in English, at the business or scientific level.

The Government Accountability Office, in a 2003 report on one of the Federal Aviation Administration's air traffic control modernization programs, recommends following the agency's guidance for managing major acquisition systems by

  • establishing, maintaining, and controlling an accurate, valid, and current performance measurement baseline, which would include negotiating all authorized, unpriced work within 3 months;
  • conducting an integrated baseline review of any major contract modifications within 6 months; and
  • preparing a rigorous life-cycle cost estimate, including a risk assessment, in accordance with the Acquisition System Toolset's guidance and identifying the level of uncertainty inherent in the estimate.